Top 10 Structural Design and Analysis Software (2019)

Image

Top 5 Tallest Buildings in the Philippines (2019)

Image
Here are the Top 5 Tallest Buildings in the Philippines.  1. Grand Hyatt Manila        Location: Taguig, Manila        Height: 318m (1,043ft)        Floors: 66        Year: 2017 2. Trump Building Manila         Location: Makati, Manila        Height: 280 m (920ft)        Floors: 57        Year: 2017 3. PBCom Manila         Location:  Makati, Manila        Height:  259m (850ft)        Floors: 52        Year: 2000 4. The Gramercy Residences         Location:  Makati, Manila        Height:  250m (820ft)        Floors: 73        Year: 2012 5. Discovery Primea         Location:  Makati, Manila        Height:  250m (820ft)        Floors: 67        Year: 2015 Wikipedia:  https://en.wikipedia.org/wiki/List_of_tallest_buildings_in_the_Philippines Youtube link:  https://youtu.be/yO0q4meBCXw

Shortcut Keys for Symbols Mostly Used in Engineering

Image
These are the common symbols that are used in Engineering.  x² - ALT + 0178 (Squared) x³ - ALT + 0179 (Cubed) x° - ALT + 0176 (Degree) ±  - ALT + 241 OR ALT + 0177 (Plus-minus sign) ¾  - ALT + 0190 (Fraction - three quarters) ε  - ALT + 238 (epsilon) ¼  - ALT + 0188 ( Fraction - one quarters) ½  - ALT + 0189 ( Fraction - one half) ñ   - ALT + 164 or ALT + 0241 (Letter - Small enye) Ñ   - ALT + 165 or ALT + 0209 (Letter - Big enye)  α   - ALT + 224 (Alpha - lower case) ß  - ALT + 225 (Beta - lower case) Γ  - ALT + 226 (Gamma) δ  - ALT + 235 (Delta - Lower case) Ï€ - ALT + 227 (pi) µ - ALT + 230 (mu/micro) Σ - ALT + 228 (Sigma-uppercase) σ  - ALT + 229 (Sigma-lower case) Ï„ - ALT + 231 (Tau) Φ - ALT + 232 (Phi - upper case) φ - ALT + 237 (Phi - Lower case) Ω - ALT + 234 (Omega) Ø - ALT + 0216 (diameter - uppercase) ø  - ALT + 0248 (diameter - lowercase) ∞  - ALT + 236 (infinity) ≥  - ALT + 242 (Greater than of Equal to) ≤   - ALT + 243 (Less than of Equal t

Document Requirements for Building Permit in the Philippines

Image
These are the requirements needed for acquiring building permit in the Philippines as per the National Building Code of the Philippines for new buildings 1. Documents Application form Certified true copy of TCT (Transfer Certificate of Title) Tax declaration Current Real Property Tax Receipt      2. Five (5) sets of plans and specifications prepared, signed and sealed              Architectural Drawings:           - Location of plan             - Site Development Plan           - Floor Plans at scale of not less than 1:100 M           - Elevation (at least four)  at scale of not less than 1:100 M           - Sections (at least two) at scale of 1:100 M       Structural Drawings:           - Foundation Plan at scale of not less than 1:100 M           - Floor Framing Plan at scale of not less than 1:100 M           - Roof Framing Plan at scale of not less than 1:100 M           - Details of footing/column at any convenient scale           - Det

Engineering Terms in Filipino You Should Know

Image
These are the 30 Engineering Terms in Filipino You Should Know 1. Alulod (Drain) - is part of building's water discharge system 2. Baytang (Tread) - is the horizontal portion of a set of stairs on which a person walks 3. Biga  (Beam) - is a structural element that primarily resists loads applied laterally to the beam's axis 4. Bisagra (Hinge) - is a mechanism that connects normally a door, window or other construction element, to either a frame or a cabinet of some type 5. Guililan (Girder) - it is the main horizontal support of a structure which supports smaller beams 6. Hamba (Jamb) - is the side-post or lining of a doorway or other aperture 7. Hulog - (Plumb bob) - a metal weight attached to the end of a plumb line. Used to establish vertical line 8. Kapak (Bulge) - honeycomb air pockets that form on the concrete 9. Masilya (Putty) - is a material with high plasticity, similar in texture to clay or dough, typically used in domestic construction and repair

Design Guide for Car Parking in the Philippines (2019)

Image
Design Guide for Car Parking in the Philippines (2019) 1. Minimum Dimension for Car Parking Automobile Classification Width(m) Length(m) Orientation Total Area(m²) Average Car 2.50 5.00 Perpendicular or Diagonal 12.50 Average Car 2.15 6.00 Parallel Parking 12.90 Standard Truck or Bus 3.60 12.00 All 43.20 Articulated Truck 3.60 18.00 All 64.80 Jeepney or Shuttle 3.00 9.00 All 27.00 2. Height for Car Parking     For height of car park inside the building, we can use 2.0m - 2.40m clear height. 3. Standard Driveway Width     No specific width from the code but we can use 3.0 m minimum. 4. Standard Driveway Slope      5. Driveways across sidewalks  To maximize the use of the sidewalk area, the surface of the sidewalk and the driveway shall as much as possible, be at the same place. The entry ramp of the driveway connecting the roadway s

How to Plot Land Title Boundary Using AutoCAD

Image
How to Plot Land Title Boundary Using AutoCAD (2019) 1. Open your AutoCAD. 2. Type DDUNITS to open the Drawing Units. 3. Change the units with the values below 4. At the Direction, choose your desired direction 5. Pick a point to start the line or polyline      Example: N 12 DEG. 25'E, 8180 mm                    S 78 DEG. 41'E, 5350 mm                     S 14 DEG. 41'W, 22080 mm                     N 75 DEG. 28'W, 4480 mm                     N 12 DEG. 25'E, 13610 mm (to the point of start)      Should input like this:                    @8180< N12d25'E                    @5350<S78d41'E                    @22080< S14d41'W                    @4480< N75d28'W                    @13610< N12d25'E (to the point of start) 6. The final drawing should look like this That's it! You should give it a try! For any questions, just comment below!

How to Apply for Comprehensive Exam in PUP (2019)

Image
1. Download the form from the PUP website.  https://www.pup.edu.ph/gs/forms     The form should look like this: 2. Fill up the Comprehensive Exam Form. 3. Fill up the updated Program of Studies (Curriculum Sheet) 4. Qualified to take the comprehensive examination are those who have completed ALL academic course requirements of the program or those who are completing them on that semester. 5. For those who are just just completing on that semester, make sure to secure a copy of your grades from your SIS account.  6. After filling up and completing your requirements, go to the cashier (GS or Main Building) and pay for Php150.00 and secure the O.R.  7. Before submitting all the requirements, make sure you have a clearance from the GS library and Accounting Office(Main building). 8. Give it to the faculty officers and don't forget to to sign in the logbook.  NOTE:  Only those with complete academic and non-academic credential/requirements shall be processed and approv